Client: Kenrite Construction
Value: Over € 100million
Involvement: Masterplanning, Civil & Structural engineering, BCAR assigned Certifier
Design Team: Hutch O’Malley; David O’Malley, Bill Hutch, Dylan Casey
Arnold Leahy Architects; Arnold Leahy, Bob Ryan
One of the most exclusive housing developments on the Golf Links road
Challenge
To review and update simulation for surface water system design under less stringent design criteria.
Solution
Survey and re-digitise existing system and reverse engineer the system. Then breakdown the estate into phases and catchment to be utilise the infrastructure.
Value
By exploiting as much as possible of the completed system development of the site could continue with limited upgrades while achieving the tighter controls